Understanding the stages helps explain where time is spent and why careful planning matters.
1. Initial Consultation and Site Survey
We begin with a site visit to understand your space, workflow and objectives. This stage identifies structural considerations, service access, landlord requirements and compliance factors. A clear project scope at this stage prevents delays later.
2. Space Planning and Office Design
Our design team develops layout proposals that accurately reflect your business’s operations. This may include:
- Open plan workspace design
- Meeting room layouts
- Breakout areas
- Demountable or glass partitioning systems
- Reception areas
- Furniture integration
Good space planning ensures circulation works properly and services are positioned efficiently before installation begins.
Depending on complexity, this stage can take 1 to 3 weeks.
3. Detailed Specification and Scheduling
Once layouts are agreed, we finalise finishes, flooring, lighting, partitioning systems and office furniture. Lead times for materials and bespoke elements are factored into the programme.
At this stage, we also confirm health and safety documentation and coordinate with landlords or building managers if required.
4. Installation and Fit Out Works
This is the visible transformation stage. Works may include:
- Partition installation
- Suspended ceilings
- Flooring
- Electrical and data installation
- Lighting upgrades
- Decorating
- Furniture delivery and installation
For smaller projects, this phase can take a few weeks. Larger office fit outs with multiple rooms or complex services will require longer.
5. Final Inspection and Handover
Before completion, we review the space with you to ensure everything meets specifications. Adjustments are made if needed before formal handover.